On behalf of Andrew James Butchery, Willand; Dancold Ltd have just completed a complete new factory fit-out.

The complete project involved the design & installation of the following:

Temperature controlled preparation area

Dry goods area

Fresh meat chiller

Large walk-in freezer

 

Dancold Ltd carried out the initial design and layout, with a few tweaks made prior to commencement on request of the customer. We then built the factory using Kingspan Grade B panels – These panels have slight variations and can have some minor damage, but it allowed us to meet the customers budget.  The entire fabrication works were completed within 3 weeks.

 

Once built, Dancold Ltd specified, supplied, installed and commissioned the refrigeration equipment. We used our preferred range of equipment, which consists of Danfoss housed condensing units, Danfoss Optyma controllers, Danfoss control valves and TEV’s, and Searle evaporators. We commissioned the systems on newer low GWP refrigerants: R452 for the freezer, R448a for the chiller and higher temperature controlled rooms. All of this was then complete within a further 5 days.

 

Dancold Ltd also designed, supplied and installed the lighting. We used all weatherproof non-corrosive LED fittings.

 